St Stephens MSCP is a 260 space car park situated in Norwich city centre and popular with shoppers and businesses.
Client
NCP
Completed
September 2012
Systems Used
TREMCO MMA Rapid Cure Flexible System &
CP Urethane System
Coverage
2,700 m²
The roof deck waterproofing was suffering from degradation and was allowing water ingress to the parking deck below. NCP contracted their Framework Contractor PBM to carry out the works. The works included removal of the waterproofing in the drive aisles and the installation of an MMA Rapid Cure Flexible System.
In the parking bays the existing polyurethane based system which was not badly degraded was over-coated with a new polyurethane system to provide a further 10 year life. New line marking was installed to the whole car park as part of the works.