Bury St Edmunds Train Station

Keely Warren / 02 May 2023

Flat roof now back on track at Bury St Edmunds Train Station

Client: 

Walker Construction 

Trusted partner:

Vision Specialist Contracting

The challenge:

Bury St Edmunds Train Station required building envelope works due to the ageing condition of Grade II listed building managed by Walker Construction. A significant issue was water damage caused by water ingress through an inefficiently waterproofed roof, invasive plant species growing through brickwork, and debris around drainage points.

The solution:

AlphaGuard PUMA Liquid Applied Flat Roof System

 

Download the full case study.